UB> Meter Readings> Proof List
Meter Reading Proof List
Summary
The Meter Reading Proof List is used to verify that the
current meter readings have been input correctly on customer accounts. Run this
report after meter reads have been manually input (UB> Meter Readings> Input
New) or imported (UB> Meter Readings> Import).
Since the Meter Reading palette is not a batch process (for example, like the New
Billing process), the Meter Reading Proof List Report is a filtered report
rather than a report that contains the transactions of a batch. Use the filters
to generate a report that contains the desired meter readings. The only fields
that are required are the beginning date and ending date fields. You should also
select the account statuses you would like to include in your report in the
Include section.
Related Links
Click here for information on importing meter readings.
Click here for information on manually entering a new meter reading.
Click here for information on the Jobs Viewer window.
Click here for information on the View Reports window.
Step by Step
1 Open the Meter Readings Proof List (UB> Meter Readings> Proof List).
2 Configure the report.
- Select the meter routes you would like to include on the Proof List in the Route field.
- Press CTL+A to highlight all of the toggles in the field. Press SPACE to check or uncheck all
of the highlighted toggles.
- Select how the report will filter in the Filter By drop-down menu. The selection
in this field will determine which fields are enabled in the Meter Readings Proof List window.
- Select Date if you would like to filter the report by meter read date. This will enable the Begin Reading Date and End Reading Date field.
- You can view the read date of a meter reading in the Read Date column on the Devices tab of the
Account Master Maintenance window (UB> Maintenance> Account> Devices tab> Meter History sub-tab).
- Select Period if you would like to filter the meter readings on the report by meter read period.
This will enable the Reading Period and Reading Year fields on the window.
- To filter the report by read date, enter a Begin Date and Ending Date
of the meter reads you want to include in the report. These fields will only be
enabled if Date is selected in the Filter By drop-down menu.
- Enter the earliest date of meter readings you want to include in the meter reading proof
list in the Begin Date field.
- Enter the latest date of meter readings you want to include in the meter reading proof list in
the Ending Date field.
- To filter the report by period, enter a Period and Year of the meter readings you want
to include in the meter reading proof list. These fields will only be enabled if
Period is selected in the Filter By drop-down menu.
- Select the status of the customer accounts you would like to include in the report. Only meter
readings attached to a customer account of a selected status will display on the report.
- Customers will have a Final status if they have been processed in the Final Account Wizard.
- Check the Include reads with zero consumption toggle if you would like to include
meter readings with no consumption on the report.
- The Meter Reading Proof List Report displays the route number, sequence number, serial numbers,
service address, UB customer number, customer name, read date, meter read period
and year, meter status, beginning read (previous read on the meter), current
read, consumption and account status. The total number of meters read on the
route and the total consumption amount is tallied at the end of the report.
- The Meter Status column will display the connection status of the meter on the customer account.
For example, if the meter has been removed from the lot, the connection status
of the meter will be Removed. You can view the connection status of a meter from
the Connections tab of the Device Maintenance window (UB> Maintenance> Device>
Connections tab> Status field).
3 Print the report.
- Click the Print icon
to generate the report immediately or enter a date and time in the field
next to the Print icon to schedule the report to generate at a later time.
- You cannot schedule a report to print on a date and time that has already passed. If you
want the report to print later in the evening, enter a PM in the AM/PM portion
of the date field before entering the hour.
- You can view the progress of the report on the Job Viewer window (SS> Utilities> Show Scheduled
Jobs). If the report has been scheduled to generate at a later time, you can view
the scheduled date and time in the Scheduled Date/Time field.
- You can open the report from the Jobs Viewer window once it has been generated.
Springbrook Software
® All Rights Reserved 2014
Toll Free Support 866-777-0069