UB> Meter Readings> Change Outs
Meter Change-Out Report
Summary
The Meter Change-Out Report displays a list of meters that have been replaced using a
meter change-out service request. The report will display the device that has
been removed and the new device that was installed on the customer account, but
the devices will not display on the report until the change-out service request
has been committed (UB> Service Requests> Commit). The report can be filtered by
meter read route and date range based on the install date of the new device. The
install date of the device is the same as the service date of the service
request that performed the meter change-out.
A meter can be removed from a customer account using a remove device or change out
service request, but only meters removed using a change-out service request will
display on this report. Once a meter change-out service request has been
committed (UB> Service Requests> Commit), the status of the original meter on
the customer account will change from Installed to Removed and the install date
of the new meter will be the service date on the service request.
Related Links
Click here for information on creating a Change-Out Device service request.
Click here for information on the Jobs Viewer window.
Click here for information on the View Reports window.
Step by Step
1 Open the Meter Change Outs window (UB> Meter Readings> Change Outs).
2 Configure the report.
- Select the meter routes to include on the report in the Route field.
When a change-out service request is performed on a device, the new device
on the customer account will inherit the meter route from the device that is
being removed.
- Hold down CTRL+A to select all of the meter routes in the field. Press SPACE to check or
uncheck the selected toggles.
- You can view the meter route attached to a device from the Device Maintenance window (UB>
Maintenance> Device> Connections tab> Route column).
- Meter routes are created and maintained in UB> Maintenance> Route.
- Enter a date range in the Begin Meter Install Date and End Meter Install
Date fields.
- The report will be filtered by the install date of the new meter on the
account. You can view the install date of a meter on the account in UB>
Maintenance> Account> Devices tab> Expand a device
type> Install Date field. The install date of the device is the
same as the service date on the change-out service request.
- The Meter Change-Out Report will display the meters that have been removed and
the new meters that have been installed on the customer accounts. The report
will display the route number, sequence number, serial/MXU/register number, service
address, customer number, customer name, period, final read, and consumption
for each meter.
3 Print the report.
- Press ENTER to generate the report immediately or enter a date and time in the field next to
the Print icon
to schedule the report to generate at a later time.
- You cannot schedule a report to print on a date and time that has already passed. If you
want the report to print later in the evening, enter a PM in the AM/PM portion
of the date field before entering the hour.
- You can view the progress of the report on the Job Viewer window (SS> Utilities> Show Scheduled
Jobs). If the report has been scheduled to generate at a later time, you can view
the scheduled date and time in the Scheduled Date/Time field.
- Open the report when the process is complete to view the report.
- You can view the report at any time once the report has been created. Reports created in the past
can always be viewed from this window.
Springbrook Software
® All Rights Reserved 2014
Toll Free Support 866-777-0069