        UB> Meter Readings> Input New
        
            Input a New Meter Reading
         
        Summary
        
         
        The Input New Meter Readings window is used to manually enter new meter readings on all of the 
	meters in a meter route. The Input New Meter Readings window also allows you to 
	generate estimated meter readings on all the meters in a route. After meter 
	readings have been entered or generated using the Input New Meter Readings 
	window, you can modify the read date, read year, read period or estimate of 
	each meter reading using the Edit Meter Reading window (UB> Meter Readings> 
	Edit).
         
        If you import meter readings from handheld devices (UB> Meter Readings> Import) you will not use 
	this palette option. If you would like to enter a meter reading on a single 
	customer account, you can enter a meter reading using the Device Maintenance 
	window (UB> Maintenance> Device> Consumption tab, or you can 
	access this device from the Devices tab of the Account Master Maintenance 
	window). You can also enter the reading by creating a read meter service request 
	using the Service Request Input Wizard (UB> Service Requests> Input> Create 
	icon).
         
        Related Links
        
         
        Click here for information on editing meter readings.
        
         
        Step by Step
        
         
        1     Select the meters you would like to enter meter readings on.  
 
            
                 
                
                    - Open the Input New Meter Readings window (UB> Meter Readings> Input New).
- The Parameters To Generate Readings Input Table section is used to select which meters you 
		would like to enter a manual meter reading on.
- Enter the type of meter you would like to enter a reading on in the Meter  Type 
		drop-down menu.
- The Route field is used to select a meter route.
                        - Only meter routes created in Route Maintenance window (UB> Maintenance> Routes) will 
			display in the drop-down menu.
- The meter route of a meter can be viewed and modified using the Device Maintenance window 
			(UB> Maintenance> Device> Connections tab> Routes 
			column).
- The Estimate Method drop-down menu is used to estimate the meter readings on the 
		meters in the route. Select a method from the drop-down menu if you would 
		like to apply an estimate to all of the meters in the route. Use the Edit 
		Meter Readings window (UB> Meter Readings> Edit) if you would like to 
		estimate the reading on a single meter in the route.
                        - Select Previous Read if you would like to estimate the consumption based on 
			the last meter reading on the meter. The current reading will be the 
		previous reading on the device, resulting in a consumption of zero.
- Select Multiply EDU’s if you would like to calculate the consumption based on the meter 
			EDU’s attached to the meters in the route. When this option is selected, 
			a field titled EDU Multiplier will become visible.- A meter EDU is entered on a device using the Device Maintenance window (UB> 
				Maintenance> Device> Connections tab> EDU column).
- The Multiply EDU option will multiply the value in the EDU Multiplier 
				field by the value in the EDU field on the meter to calculate 
				the consumption on the meter. For example, if you enter 100 in the 
				EDU Multiplier field and the meter has an EDU of 4, the consumption 
				will be calculated at 400 units.
 
- Select Previous Reading Period if you would like to estimate the new meter reading based on the 
			consumption during the last meter read period (consumption will be 
			estimated based on meter read period, not meter read date). This method 
			will add the consumption during the previous meter read period to the 
			last meter reading to calculate the new meter reading and consumption. 
			For example, if the previous period consumption and meter reading was 
			1000 and 12,000, the estimated reading will be 13,000 with consumption 
			of 1000 units.
                            - If there are multiple readings during the previous meter read period, those meter 
				readings will be added together to determine the estimated amount.
- If a meter was not read during the previous period, the meter reading will default 
				to the last reading that was read on the meter. If there is not a 
				meter reading during the previous meter read period, an Expansion 
				icon will display next to the meter reading.
- If you would like to generate the estimate based on the last read period rather 
				than the meter read of the last period, select Previous Reading’s 
				Period in the Estimate Method drop-down menu.
                            - Select Same Period Last Year if you would like to use the consumption of the same period in 
			the previous year as the estimate of the current reading. If the meter 
			does not have a reading in the same period in the last year, the reading 
			will default to the prior reading on the meter.
- Select Winter Average if you would like to use the last calculated and committed 
			winter average on a meter to estimate the consumption. If no winter 
			average is found on the meter or the calculated winter average has not 
			been committed, the reading will default to the prior reading on the 
			account.
                                - If there are multiple winter averages on the customer account, the consumption 
				will calculated based on the winter average with the most recent 
				winter average effective date (UB> Maintenance> Account> Winter Averages tab> Effective Date field). 
				This applies even if the winter average effective date is in the 
				future. This means winter averages that have still not reached their 
				effective dates will be used to calculate the consumption.
- Enter the default read date in the Default Read Date drop-down menu. The default date will 
		be used as the read date for all meter readings in the route.
                            - You will not be able to modify the read date of specific meters from the Input New Meter 
			Readings window. If you would like to modify the read date of a specific 
			meter, open the reading in the Edit Meter Readings window (UB> Meter 
			Readings> Edit) after the readings have been entered.
- Enter the Reading Period and Reading Year of the meter readings.
                            - You will not be able to modify the reading period or reading year of specific meters 
			from the Input New Meter Readings window. If you would like to modify 
			the reading period or reading year of a specific meter, open the reading 
			in the Edit Meter Readings window (UB> Meter Readings> Edit) after the 
			readings have been entered.
- Click the Refresh icon  once you have select the meter readings you would like to enter. This will 
		populate the Input New Meter Readings window with the meters in the selected 
		route. If you have selected an estimate meter readings option, the meters 
		will populate with the estimated meter readings. once you have select the meter readings you would like to enter. This will 
		populate the Input New Meter Readings window with the meters in the selected 
		route. If you have selected an estimate meter readings option, the meters 
		will populate with the estimated meter readings.
                            - UB module accounts that have meter readings set up as New will not display in the window. You can view the New toggle
			on meter readings using the Device Maintenance window (UB> Maintenance> Device> Consumption tab> Select 