WO> Equipment Readings
Equipment Readings
Summary
Equipment readings allow you to track the usage of equipment that has been created in the Work Orders
module. The primary function of entering equipment readings on an asset is to automatically generate work orders
based on the usage of that asset. An example of this would be creating a work order to change the oil of a
car each time the car reaches 3000 miles. If you attach a maintenance job to the asset type that is
attached to the asset, work orders will be generated for the
maintenance of that asset as equipment readings accumulate.
Related Links
Click here for information on Equipment Code Maintenance.
Click here for information on Unit Maintenance.
Step by Step
2 Generate the Equipment Readings batch.
- Open the Generate window (WO> Equipment Readings> Generate).
- Click the Confirm icon
to generate the batch immediately or select a date from the drop-down menu if you would like the batch to generate at a later time.
4 Edit the equipment readings.
- Open the Edit window (WO> Equipment Readings> Edit).
- The new row grid design of this window allows the user to quickly tab through the columns, key in the equipment reading information, and press ENTER to begin creating the next equipment reading line item.
- Click the Ellipsis icon
in the Equipment Code field to select the equipment that will be included in the readings batch.
- Click the Ellipsis icon
in the Unit Type field to select the unit of measure that the reading will refer to.
- The Date field will default to today's date but can be edited.
- The Sequence field will automatically populate with the sequence number of the new reading.
- The first equipment reading for a piece of equipment associated with a particular read date will be zero. Each sequential reading on that piece of equipment for that particular read date will increase by one.
- Enter the Current Reading on the equipment.
- The Consumption field will automatically update after the current reading is entered. Consumption is calculated by subtracting the Previous Reading value from the Current Reading value.
- Enter any optional Notes related to the equipment reading.
- This field can accommodate up to 1000 characters, but only 60 will display on the proof list and only 30 will display on the equipment history record.
- Once the line item is complete, simply press ENTER to add the equipment reading line item to the data grid and begin creating a new line item.
- If an equipment reading line item is deleted, any dependent readings will automatically update. Current readings will remain the same, but consumption amounts will be recalculated to reflect the total consumption between the first Previous Reading and the last Current Reading. For example, a piece of equipment could have three readings:
- 1 - Previous Reading = 0, Current Reading = 25, Consumption = 25.
- 2 - Previous Reading = 25, Current Reading = 35, Consumption = 10.
- 3 - Previous Reading = 35, Current Reading = 55, Consumption = 20.
- If reading number two is deleted, the recalculated equipment readings would look like this:
- 1 - Previous Reading = 0, Current Reading = 25, Consumption = 25.
- 2 - Previous Reading = 25, Current Reading = 55, Consumption = 30.
- After all of the equipment readings have been entered, click the Save icon
to continue to the next step.
5 Print the proof list.
- Open the Proof List window (WO> Equipment Readings> Proof List).
- Click the Print icon
to process the report immediately or enter a date and time in the field next to the Print icon to schedule the report to generate at a later time.
You can view the progress of the report on the Job Viewer window (SS> Utilities> Show Scheduled Jobs). Click here for information on the Jobs Viewer window.- Click the Print icon drop-down menu and select Print Preview to preview the report before printing.
- Click the Print icon drop-down menu and select Excel to export the report data to an Excel spreadsheet as unformatted data.
- Click the Print icon drop-down menu and select Excel (Formatted) to export the report data to an Excel spreadsheet that includes much of the Springbrook formatting found on the printed version of the report.
- Once the report is generated, you can also display the report using the View Reports window (SS> Utilities> View Report). Click here for information on the View Reports window.
- The Proof List will display the Equipment Code, Unit Type, Consumption Date, Previous Read, Consumption, Current Read, and Notes.
6 Commit the Equipment Reading batch.
- Open the Batch Commit window (WO> Equipment Readings> Commit).
- Click the OK button to commit the batch.
- The new equipment readings will display on the Equipment Maintenance window (WO> Maintenance> Equipment> Meter History tab).