- The Estimates tab is used to add LEMS activity line items to the work order estimate.
- The new row grid design of this tab allows the user to quickly tab through the columns, key in the activity information, and press ENTER to begin creating the next activity line item.
- Click the Activity Type Ellipsis icon
to create a new line item.- Activity Types are user defined groups used to classify activities that are recorded on work orders. By associating a work order with specific activity types, you can limit the activities that can then be attached to a work order or estimate.
- Activity Types are created and maintained on the Activity Type Maintenance window (WO> Maintenance> Activity Type). Click here for information on Activity Type Maintenance.
- Select a LEMS type from the drop-down menu.
- The selected LEMS type will determine the available options in the remaining activity line item columns.
- Select Labor to create a labor activity item.
- Click the Reference Type drop-down menu to specify how this labor estimate will be classified.
- Select Employee to attach the activity item to a specific employee.
- Click the Reference Code Ellipsis icon
to select an employee. - Select Position to attach the activity item to a position.
- Click the Reference Code Ellipsis icon
to select a position.
- Select Equipment to create an equipment activity item.
- The Reference Type field will populate with Equipment.
- Click the Reference Code Ellipsis icon
to select an equipment code.
- Select Materials to create a materials activity item.
- The Reference Type field will populate with Item.
- Click the Reference Code Ellipsis icon
to select an item.
- Select Services to create a services activity item.
- The Reference Type field will populate with Vendor.
- Click the Reference Code Ellipsis icon
to select a vendor.
- Select Adjustments to create an adjustments activity item.
- Adjustment activity items are used to bill miscellaneous charges to the estimate. The only required field when entering an adjustment activity item is Total Amount.
- The Total Amount field is determined by the sum of the Base Amount and Overhead fields.
- Click the Asset Code Ellipsis icon
to attach an asset to the LEMS activity item estimate if the work order will result in a Fixed Asset Original Cost Adjustment.- Attaching a fixed asset to an activity line item can be useful when, for example, an improvement type work order is meant to provide improvements to multiple fixed assets. By creating an activity line item for each fixed asset, you can keep all of the improvement activity on the same work order but still track the costs associated with improving each asset.
- Fixed assets are created and maintained on the Fixed Asset Maintenance window (FA> Maintenance> Fixed Assets). Click here for information on Fixed Assets.
- The Units column is used to specify the number of units required by the Labor, Equipment, or Materials action item.
- The Units column is disabled for Services and Adjustments.
- The Amount Per Unit column will automatically populate if the selected item in the Reference Code field has an attached rate or cost.
- For Labor, the amount per unit is the Hourly Rate attached to the Employee or Position.
- For Equipment, the amount per unit is the Rate attached to the selected piece of Equipment.
- For Materials, the amount per unit is the Cost Per Item attached to the selected Item.
- The Amount Per Unit column is disabled for Services and Adjustments.
- The Base Amount column will automatically populate for Labor, Equipment, and Materials activity items.
- This amount is calculated using the following formula:
(Units) X (Amount Per Unit)
- For Services and Adjustments action items, the Units and Amount Per Unit columns are disabled so the Base Amount field will be enabled for direct editing.
- The Overhead column will automatically populate for all action items.
- This amount is calculated using the following formula:
(Base Amount) X (Overhead % specified on the General tab)
- The Overhead column can be edited.
- The Markup field is used to specify an additional overhead markup amount on the activity line item.
- This field is only enabled when generating materials activity line items that are associated with IC module inventory items.
- This field is often used when an inventory item is issued at a per unit price that is higher than the standard per unit price.
- The Total Amount column will automatically populate for all action items.
- This amount is calculated using the following formula:
(Base Amount) + (Overhead)
- The Total Amount field cannot be edited.
- A Total Amount total will be provided at the bottom of the Estimates tab. Additional Total Amount totals can also be calculated if you group the data grid by clicking and dragging a column header into the space above the column headers.
- Check the Billable toggle to make the activity line item eligible for a WO Billings batch.
- Enter an optional activity line item Description. The description can be up to 48 characters.
- The Committed and Billed toggles will be checked only after the activity line item is committed or billed.
- Once the line item is complete, simply press ENTER to add the activity line item to the data grid and begin creating a new line item.
- Highlight an existing activity line item and click the Delete icon
to remove that line item from the estimate.
- Click the Save icon
to add the completed activity line items to the estimate.